1.檢查機(jī)臺各部位是否正常;
2.根據(jù)派工單所需的加工要求,選擇合適的研磨棒;
3.把研磨棒裝在馬達(dá)軸上;
4.把工件放在無心軸承上,并用無心軸承固定桿將工件夾?。?BR>5.用千分表檢查工件是否水平,如有斜度,用斜度調(diào)整螺釘將斜度調(diào)為0度;
6.打開無心軸承升降開關(guān),用無心軸升降圓盤調(diào)節(jié)工件到適當(dāng)?shù)母叨?,并鎖緊無心軸承;
7.用工件擋桿調(diào)好工件伸出的長度;
8.用左右移動桿慢慢將研磨棒伸進(jìn)工件內(nèi),然后用左右行程擋塊固定好研磨棒向左邊移動的距離;
9.轉(zhuǎn)動研磨棒移動圓盤,將研磨棒慢慢靠近工件;
10.打開電源開關(guān),打開研磨棒馬達(dá)開關(guān),及打開無心軸承開關(guān);
11.慢慢轉(zhuǎn)動研磨棒進(jìn)給圓盤,當(dāng)研磨棒碰到工件后,將左右移動桿左右勻速移動,使研磨棒研磨工件;
12.每次進(jìn)刀為0.01—0.02mm,進(jìn)刀時不可多快,加工中應(yīng)多次測量;
13.加工完后,做好機(jī)臺的衛(wèi)生及保養(yǎng)。
中譯英:
1 inspection machine parts are normal;
2 according to the dispatch list required processing requirements, select the appropriate grinding rod;
3 grinding rod is installed on a motor shaft;
4 the workpiece is placed in a bearing, and a bearing rod workpiece clamping;
5 the dial indicator is used to check whether a workpiece is level, such as slope, slope angle adjustment screw with0 degrees inclination adjustable;
6 open without bearing lifting switch, with no mandrel lifting disk adjusting the workpiece to the proper height, and the locking without bearing;
7 bar adjustable workpiece workpiece for extending the length of;
8 move around the rod slowly grinding rod into the workpiece, and then use the left and right stroke chock block is fixed to the moving distance of the grinding rod left;
9 the rotating grinding rod moving disc, the grinding rod slowly around the workpiece;
10 turn on the power switch, open the grinding rod motor switch, and a switch to open bearing;
11 the rotated slowly grinding rod feed disc, when the grinding rod encountered after the workpiece, will move the lever to the left to move at a constant speed, so that the grinding rod grinding workpiece;
12 each feed for0.01 0.02mm, feed can not be fast, processing should be measured for many times;
13 after the operation, good health and maintenance machine.